Plastering Check-List As Followed By The Professional Plastering Services

Plastering works require a lot of perfection. This is why it is only done by professionals. You can hire plastering services depending on the type of work you need. Depending on the material quality you can expect work to finish.

But if you hire an expert team, you may not have to worry about the work quality. You can search for the plastering in Auckland team. Expert plastering services will always follow procedures so they get desired results after the plastering is done on the surface.

Pre plastering checklist

The pre-plastering stage is important. Experts will always ensure that they have all tools and equipment ready at the worksite. Before they start with the plastering task, they may want to check with their tools and plastering materials.

No, how old or new the wall is, a professional team will always ensure that the blockwork is kept ready at least a week in advance before the plastering. The professional team will also ensure that they have sufficient material so a thickness of a minimum of 12 mm is maintained on the walls.

The preparation task

Before the plastering material is applied to the walls, the team will always take time and inspect the condition. The wall should always be wet so it can soak up more water before the plastering material is applied.

This is important so the walls do not soak up any plastering material. The team will always test the walls for moisture so water from the plastering is not absorbed by the walls. The professional team will always follow different mixed capacities for ceiling and walls. If the plastering material is heavy the nit may not be ideal for use on the ceiling.

Preparing the mix

The plastering mix has to be prepared and used fresh. You cannot use a plastering mix that has been kept for over an hour. In most cases, you get the best result only if the mix has been used up within half an hour.

Once the plastering is applied then the team will also check the surface for undulations. If the team is expert they will make use of halogen lamps to carry out this task. In general, the team will use yellow lights for better inspection.

It is easy to notice undulations in the presence of halogen light. Uneven surfaces will always show signs of undulations.

Final inspection task

The walls have to be inspected finally before the task is completed. The team will try and notice if any cracks or unevenness is left out on the surface. The team will also make use of oil balance to measure the level of the walls and ceiling.

It is important to keep checking the plastering thickness. If the thickness is high then the team will scrape off the thin layer and smoothen the surface back again.